Institutional output · Illustrative

What a cohort gap analysis looks like.

The shape of the report an institution receives: every pillar scored against the published benchmark, the three widest divergences ranked, and a 30/60/90-day outline built from those findings.

Illustrative example, not a real client. The cohort figures on this page are invented for demonstration. The benchmark column beside them is real, read from the published ARETE Readiness Index.

01 · Scores by pillar

The cohort against the benchmark

A positive gap means the cohort sits above the network benchmark on that pillar. A negative gap is the distance to close.

PillarCohortBenchmarkGap
Direction Clarity6267.0-5.0
Career Relevance5865.1-7.1
AI Readiness7169.2+1.8
Digital Visibility3453.1-19.1
Income Resilience3841.7-3.7
Adaptability5559.0-4.0
Systems Thinking4148.2-7.2
Execution Habits4756.9-9.9
Digital Asset Ownership2945.5-16.5
Long-Term Positioning4458.6-14.6
Strategic Learning6064.0-4.0
Future Preparedness6655.2+10.8

Benchmark: ARETE Readiness Index, n = 309, as of 16 November 2026. Cohort column: illustrative.

309 completed assessments, one per person. Test records excluded, institutional and individual sittings both counted. Behavioural self-report from ARETE's network (not a random sample). As of 16 November 2026.

02 · The three largest gaps

Ranked by severity

1

Digital Visibility

Severe

34 against a benchmark of 53.1(-19.1)

2

Digital Asset Ownership

Severe

29 against a benchmark of 45.5(-16.5)

3

Long-Term Positioning

Material

44 against a benchmark of 58.6(-14.6)

Severity rubric: Severe at 15 points or more from the benchmark, Material at 8 to 15, Moderate below 8.

03 · The 90-day outline

What to do about it

The paid institutional step produces this outline from the cohort's own data. It is a sequence of mechanisms and a re-measurement, not a training menu.

First 30 days

Name the gap and own it

  • ·

    Put the baseline in front of leadership as measured data, not opinion, and agree which two pillars the organisation will move first.

  • ·

    Assign one named owner per priority pillar. A gap with no owner does not close.

  • ·

    Repeat the assessment window for any department that fell below the reporting floor, so no group is invisible.

Days 31 to 60

Build the mechanism, not the course

  • ·

    Convert the two priority pillars into a working practice each team performs weekly, with a visible artefact behind it.

  • ·

    Brief line managers on what the department figures mean and what they are not permitted to infer from them.

  • ·

    Set the re-assessment window now, before any intervention begins, so the measurement is not chosen after the result is known.

Days 61 to 90

Re-measure and prove the movement

  • ·

    Re-run the same instrument with the same cohort and compare pillar by pillar against the baseline.

  • ·

    Report the change honestly, including the pillars that did not move, and adjust the next quarter on that evidence.

  • ·

    Decide the next cohort: widen to the whole institution, or deepen the two pillars that resisted change.

Get this on your own cohort.

The free baseline for 20 to 50 staff produces the same structure with your real figures in place of the illustrative ones.

Request your free baseline